- Tel: 0086-21-35324116
- E-mail: sales@shenglincooling.com
Introduction
This system is designed for high-efficiency immersion cooling applications and features the following components and deployment requirements:
Modular Design:
Includes two main modules:
· Immersion oil cooling tank
· Coolant Distribution Unit (CDU)
These are connected in the plant room and linked to an outdoor dry cooler.
Factory Prefabricated:
All structures are pre-assembled and fully tested before delivery, ensuring quality and quick on-site deployment.
Flexible Deployment:
Suitable for installation in factory buildings with a level concrete surface or custom foundation.
Site Requirements:
· Access to main power supply
· Connection to a cooling tower
· Network access
These allow for fast and flexible setup.
Number of Miners |
192×M66;120×S21 XP Imm |
Heat Dissipation |
1.1MW |
Flow Rate |
150m³/h (Oil);160m³/h(Water) |
Inlet and Outlet Temperature |
61.6℃/54.46℃ (Oil);57.5℃/51.5℃ (Water) |
Cooler |
Dry Cooler |
Power Supply |
3*380V/3*415V/3*480V, 50/60Hz |
Power Distribution Unit |
Smart PDU |